Programming projects FEDER 2014 – 2020
Energetic optimisation of building G (VUB campus Etterbeek)
In building G on the VUB campus in Etterbeek, both education and research activities of the Faculty of Science and Bioscience Engineering take place. The building dates from 1975 and is no longer energetically in order.
To remedy this, the building will be renovated layer by layer. In the first phase, the two upper floors (G8 and G9) with the largest consumption will be tackled (13 % of the surface uses 54 % of the total energy of the building). These two layers will be stripped almost completely. ERDF funding will be used for the three sections with an impact on energy efficiency and CO2 emissions.
This project has been selected in the framework of the call for projects « Improving energy efficiency in public buildings » for 2018.
Address: CAMPUS ETTERBEEK VUB PLEINLAAN 2 (GEBOUW G) Bruxelles 1050 Belgique
Projects category: Axe 3
Website: WEBSITE VUB
Links: –
Programme: 2014 – 2020
Total budget: 6.60 Mio €
EU + BCR Budget: 1.50 Mio €